As the world struggles to maintains its requirements for fossil fuel, we have assisted several large EPC contractors to construct a variety of alternative energy plants across the UK.
Below are some of our previous projects within the renewables and technologies sector.
Project – Mercia waste Management Facility
Value – £6.7 million (Bunker Structure)
Brief – Using a mixture of both slip form and jump form technologies, we carried out the management of the construction of the full waste bunker and associated reinforced concrete structures.
When engaged in the project, the contractor’s program was substantially delay and with only 5 months to complete the structure to avoid being exposed to damages in his contract.
Caledonia formulated, implemented and carried out a construction process that completed the top bunker wall in 4 months to facilitate the installation of the process equipment and remove the bunker from the critical path of the project. This reduced the contractor’s exposure to damages and allowed the bottom bunker to be constructed after the main bunker wall.
Client – Interserve
Services – Project management. Commercial management. Sub-contractor management. Design management. Temporary works design & coordination.
Project – Glasgow waste recovery centre
Value – £150 million
Brief – Situated on the south side of Glasgow city, the newly constructed waste recovery centre was the first time 3 sperate renewable technologies were incorporated into the one plant.
These technologies enable the plant to recover waste fuel, generate power from the incineration of this fuel, and run also run a CHP engine utilising gas yielded from the anaerobic digestion tanks.
Client – Interserve
Services – Project Management. Project Controls. Temporary Works. Sub-contract administration.
Project – Levenseat EfW
Value – £125 million
Brief – As a German contractor working in the UK, M&W group required substantial management support. Caledonia assisted with the management of the full civil and building works related to the construction of a new energy from waste plant in central Scotland. We provided support over an 18-month period delivering a budget of £45 million for the civils and building works.
Client – M&W Group
Services – Project Management. Design coordination. Temporary works. Project controls. Contract & commercial management.
Scotland’s leading provider of consulting engineering and construction project management services
01383 663733
info@caledoniafrc.co.uk
Unit 18, Liberty House
15 Cromarty Campus
Rosyth KY11 2YB
© 2024 Caledonia FRC Ltd | Registered in Scotland: SC684687
Website Design in Fife by Simplicity Marketing